Sanderson Hotel - Booster Set Installation - The pressure was on!

The pressure was on for EMR Silverthorn when we were asked to install a new Dutypoint 15kW Triple Booster Set at the Sanderson Hotel in London

The pressure was on for EMR Silverthorn when we were asked to install a new Dutypoint 15kW Triple Booster Set at the Sanderson Hotel in London. The works were to be carried out overnight as the hotel water supply would be unavailable once the valves were isolated. EMR Silverthorn had a 6 Hour window to carry out the install!

Numerous site visits were carried out beforehand and all the pipework was prefabricated to minimise downtime. EMR Silverthorn worked closely with Dutypoint Systems to manufacture a bespoke Set that would match the existing dimensions and duty.

Sanderson Hotel Chief Engineer Attila Fazakas had this to say once the install was complete -

"Thank you to you and your team for this incredibly smooth job. I am impressed by their diligence and professionalism, Everything went perfectly, water has been back on and the Booster Set is running two hours ahead of schedule!"

 

 

Sanderson Hotel

 

News

Testimonials